Construction Tips

Where to start construction: 1. The choice of location (the illumination level of the ground.) 2. Digging. The walls are best done at a slight angle. Depth is desired by 60 cm 3. Align the bottom. 4. Drainage (drainage pipe in the ground).

5. Sand Pillow 5-10cm. 6. Laying of the film to the reservoir (the film is not stretched, the wrinkles will go under water pressure). 7. You can put a wall of stone. 8. Filling the pond water.

Trimming the ends of the film. Fish. In the pond with a depth of 3h3h0.6 pm all year round living Rotan, Carp. In the summer of freshwater fish, well get accustomed perch. But do not look overpopulate pond fish. Vegetation in the pond. Lily, lily better to plant in a pot filled with sand. Very good winter, carry a complete freezing of the reservoir to the bottom. Uhod.Vesna: In the period from flowering trees shed pollen, which is necessary to collect a gauze net. Summer. Water in the pond is recommended to periodically update the part. Autumn. Fallen leaves. In autumn it is desirable to cover the pond grid to reduce the hit to the bottom leaves. Winter. pond of prefabricated forms may suffer due to distention of the ice. Therefore, the drop on the surface of the unfrozen pond, plastic bottles, sealed tubes or paleno.